Subuli irrigation terminal report |
4.55 MB |
PDF |
Subuli irrigation terminal report |
SDR1 Project Progress Report (February-September, 2022) |
1.93 MB |
PDF |
SDR1 Project Progress Report (February-September, 2022) |
Kombolcha Project_Report October 2021 |
1.72 MB |
PDF |
Kombolcha Project_Report October 2021 |
Gibe kechema Irrigation Based Integrated Development 2019 |
5.17 MB |
PDF |
Gibe kechema Irrigation Based Integrated Development 2019 |
Gibe terminal report |
5.08 MB |
PDF |
Gibe terminal report |
Field Assessment Draft_Report on Rangeland Management & Natural |
2.38 MB |
PDF |
Field Assessment Draft_Report on Rangeland Management & Natural |
Demale Terminal Report |
3.03 MB |
PDF |
Demale Terminal Report |
Demale extension project annual report for 2019 |
3.70 MB |
PDF |
Demale extension project annual report for 2019 |
CHIFRA IRRIGATION BASED INTEGRATED DEVELOPMENT PROJECT |
5.91 MB |
PDF |
CHIFRA IRRIGATION BASED INTEGRATED DEVELOPMENT PROJECT |
CSSP2 Terminal report 2021 |
2.17 MB |
PDF |
CSSP2 Terminal report 2021 |
Aura Anthropology Study Report |
12.52 MB |
PDF |
Aura Anthropology Study Report |